From: "Noel Camron Hastings" Subject: 3.5m night Log 20020706 Date: Sun, 7 Jul 2002 12:27:16 -0600 APACHE POINT OBSERVATORY 3.5m Telescope Night Log Saturday, July 6, 2002 ACTUAL ASTRONOMER OBSERVER(S) INSTRUMENT START FINISH ------------------------------------------------------------------- P.McGhee P.McGehee DISII - Low --:-- --:-- D.York D.York Echelle --:-- --:-- INST SCHEDULED WEATH EQUIP OBS DAY NOTUSED I/RO/DN START FINISH D B D B D B USE D B -------------------------------------------------------------------- NM03/O 21:18 01:00 3.7 0 0 0 0 0 0 0 0 UC02/R 01:00 04:59 2.5 1.5 0 0 0 0 0 0 0 note: scheduled times listed include instrument change time ------------- ACTIVITY LOG -------------- Observing Specialist: Noel Camron Hastings Clouds and rain and clouds and mist and clouds and rain..... We gave up when the rain stretched from here to ABQ on the radar images! ------- FAILURE LOG ------- PROG INST FAILURE TIME S/E/G/D/O TI/SHU START FINISH DESCRIPTION ----------------------------------------------------------------------- ---------------- FOCUS LOG --------------- Air/Truss Wind Time Instrument Focus Az El Temp-C Dir MPH filt FWHM --------------------------------------------------------------------- --------------- WEATHER LOG ---------------- Wind Precip.or Time Temp F Dewp F MPH Direction Dust Sky Conditions ------------------------------------------------------------------ 17:01 66 36 13 252 (WSW) 1593 cloudy none 18:01 63 37 11 276 (W) 1555 cloudy none 19:01 64 35 2 340 (NNW) 1112 cloudy none 20:01 64 34 12 10 (N) 1115 cloudy none 21:01 60 44 14 30 (NNE) 1611 cloudy none 22:01 63 35 6 17 (NNE) 1011 cloudy rain? 23:01 61 38 2 5 (N) 1164 cloudy rain & mist 00:01 57 47 15 47 (NE) 1497 cloudy rain & mist 01:01 58 42 18 67 (ENE) 887 cloudy rain & mist 02:01 58 41 7 38 (NE) 827 cloudy rain & mist 03:01 55 43 14 31 (NNE) 850 cloudy rain note: the wind was coming from the azimuth listed. The convention used is north=0 degrees, east=90 degrees. The dust count is particles > 1u per 0.1 cubic feet. TELESCOPE STATUS Primary, secondary, and tertiary mirrors in place and collimated. Primary support system operational. Mirror ventilation system in place. Telescope drives operational. Current Remark version: 2.80b Current guide software version: GIm Ctrlv4.1b4 Current TCC version: 2.6.5