From: Russet McMillan Subject: 3.5m Night Log 20010219 Date: Tue, 20 Feb 2001 06:15:43 -0700 (MST) APACHE POINT OBSERVATORY 3.5m Telescope Night Log Monday, February 19th, 2001 ACTUAL ASTRONOMER OBSERVER(S) INSTRUMENT START FINISH -------------------------------------------------------------------- J.Holtzman J.Holtzman DIS-Med 17:10 06:10 INST SCHEDULED WEATH EQUIP OBS DAY NOTUSED I/RO/DN START FINISH D B D B D B USE D B -------------------------------------------------------------------- NM02/O 18:46 05:48 0 0 0 0 10.5 0.5 0 0 0 note: scheduled times listed include instrument change time ------------- ACTIVITY LOG -------------- Observing Specialist, 1st Shift: Jack Dembicky Started cooling (opened louvers/fans on) at 16:50. DIS has been mounted all day long. I did not home the instrument and he will check the calibrations since he did not want the turet/slit wheel to be moved. I did reboot the PC in the computer room, performed a 'dis init' and 'dis_define_gratings'. Louvers were closed at 17:05 for observer to do cals. Opened enclosure at 18:00 and turned the instrument for full operations to the observer. Louvers opened again at 18:00. Things ran smooth otherwise. Observing Specialist, 2nd Shift: Russet McMillan Observing second half went well in general, aside from a few small difficulties. The seeing was too good ( 1u per 0.1 cubic feet. TELESCOPE STATUS Primary, secondary, and tertiary mirrors in place and collimated. Primary support system operational. Mirror ventilation system in place. Telescope drives operational. Current Remark version: 2.62. Current guide software version: GIm Ctrlv3.0b27. Current TCC version: 2.5.0b2 Current MC version: v1_7_3.