From: Russet McMillan Subject: 3.5m Night Log 20000729 Date: Sun, 30 Jul 2000 05:42:20 -0600 (MDT) SATURDAY JULY 29 2000 APACHE POINT OBSERVATORY OBSERVING LOG ACTUAL ASTRONOMER OBSERVER(S) INSTRUMENT DATE START FINISH Gillespie McMillan DIS, S-H, 7/29-30 02:25 03:45 Echelle INST SCHEDULED WEATH EQUIP OBS DAY NOTUSED I/RS/DN START FINISH D B D B D B USE D B EN02/S/D 21:03 05:16 6.9 - 0 - 1.3 - 0 - 0 (note: times listed include instrument change time) ACTIVITY LOG (* means a trouble report has been issued or appended to) Observing Specialist: McMillan Scheduled science was pre-empted so that we could do a few last engineering tests which have been delayed by weather. Conditions were poor again tonight, with a thunderstorm passing through around midnight. After the storm passed and the skies started to clear, smoke from the nearby controlled burns began to pose a problem. These fires are supposedly all out, but perhaps the strong wind gusts associated with the storm caused something to kick up. The rapid and extreme changes in particle counts (1000-5000 in five minutes, then back) made it difficult to judge closing conditions. Humidity was also pushing the closure limit, although that was slightly easier to deal with since the telescope never cooled to air temperature. I used the closed time to do a rough focus of the DIS slitviewer on the slit; it should be usable now, although not perfect. I also calibrated the DIS gratings and did a few tests of repeatability of grating motions, which seems much improved (although the tests were limited). The newest version of Remark seemed to deal well with DIS. I opened at 02:25 when the clouds began to clear away. During the partly-cloudly period, I put a star on the boresight at DIS, then obtained tip/tilt values for the tertiary at NA1 and entered these into the file. * The "not a full step" error was still appearing for tertiary actuators B and C, although they seemed to be moving correctly and caused no problem. I did one confirmation test of the the tip/tilt values for both the echelle and the Shack-Hartmann, both of which seemed excellent. By stretching the closure rules for humidity and particle counts, I was able to get Shack-Hartmann data at five altitudes with a warm telescope (I did turn on the telex fans in spite of the smoke threat). I'm not certain these will be usable, since it seemed on the video camera that the collimation was quite far out, judging from the asymmetrical focus donuts. I hoped to have time to improve it by eye and take another set of data points, but the particle counts spiked up to 5000 again, so I closed at 03:45. Humidity kept the telescope closed for the remainder of the night. In summary, three of the most pressing engineering tasks were addressed tonight, but they were done hastily because of the weather threats and might need to be refined at a later point. OBSERVER COMMENTS FOCUS LOG Time Instrument Focus Az El #Temp Dir MPH filt FWHM " 03:00 S-H 270 #First temp is air, second temp is telescope. WEATHER Wind Time Temp F Dewp F MPH Direction Dust Sky Precip. 18:01 64 42 9 86 (E) 481 ptly cldy none 19:01 62 43 13 78 (ENE) 498 ptly cldy none 20:01 59 47 18 86 (E) 1102 mstly cldy none 21:01 58 44 16 63 (ENE) 785 cloudy none 22:01 57 49 28 75 (ENE) 1722 cloudy rain 23:01 56 50 4 151 (SSE) 1170 cloudy rain 00:01 52 45 14 81 (E) 768 cloudy none 01:01 52 46 19 67 (ENE) 6865 cloudy none 02:01 53 47 12 83 (E) 1980 mstly cldy none 03:01 52 49 8 85 (E) 1079 ptly cldy none 04:01 51 48 7 84 (E) 1326 mstly clr none 05:01 51 49 0 45 (NE) 1712 ptly cldy none note: the wind was coming from the azimuth listed. The convention used is north=0 degrees, east=90 degrees. The dust count is particles > 1 micron per 0.1 cu. ft. TELESCOPE STATUS Primary, secondary, and tertiary mirrors in place and collimated. Primary support system operational. Mirror ventilation system in place. Telescope drives operational. Current Remark version: 2.55b5 (2.62 in testing). Current guide software version: GIm Ctrlv3.0b27. Current TCC version: 2.4.0. Current MC version: 1.7.3. - Russet McMillan