From: Russet McMillan Subject: 3.5m Night Log 991216 Date: Fri, 17 Dec 1999 06:11:21 -0700 (MST) THURSDAY DECEMBER 16, 1999 APACHE POINT OBSERVATORY OBSERVING LOG ACTUAL ASTRONOMER OBSERVER(S) INSTRUMENT DATE START FINISH Staff Deglman, Loomis all 12/16-17 18:30 05:30 McMillan INST SCHEDULED WEATH EQUIP OBS DAY NOTUSED I/RS/DN START FINISH D B D B D B USE D B EN02/S 17:57 06:01 0 0 0.5 0.6 4.3 6.6 0 0 0 (note: times listed include instrument change time) ACTIVITY LOG (* means a trouble report has been issued or appended to) 1st half observing specialist: Loomis, Deglman The telescope was opened at 18:30 MST. Opening was delayed by setup of the Shack-Hartmann device. The sky was partly to mostly cloudy, with thick cirrus. One of the Forest Service controlled burns flared up (the wind was gusty) near the lower end of the Observatory driveway. Sunspot fire personnel were contacted. Minor changes were made to the DIS and GrIm2 instrument blocks and these checked. *Error messages were coming from the tertiary controller, and one of the motors wouldn't move. The problem cleared after the controller was reset and rehomed. Tertiary tip tilts were checked for NA1. Adjustments are being made during the 2nd half of the night... 2nd half observing specialist: McMillan Second half remained mostly clear, with patchy cirrus and variable seeing (the best obtained with SPIcam was 0.88 arcsec, very comparable to the DIMM output at the time). I spent some time confirming the tertiary tip/tilts for NA1, both by placing a star on the NA2 boresight and then rotating, and by checking the pointing in various parts of the sky. Eventually I decided the values obtained last night were adequate; almost all stars appeared within ten arcseconds of the slit, and most were within five arcseconds. Once I had settled on the tip/tilt values, I updated the scale and orientation portions of the echelle instrument block. After that, I spent an hour confirming that two people (or at least one healthy person) are required to mount the Shack-Hartmann camera. By the time I gave up, it was too late to obtain useful data. Some form of instrument lift for that mounting plate would be very helpful. OBSERVER COMMENTS FOCUS LOG DECEMBER 16 1999 Wind Time Inst Focus Az El #Temp Dir MPH filt FWHM " 19:00 DIS 100(998) 290 44 0.9/1.8 12 28 r 1.6 20:30 GrIm2 -100(774) 237 49 0.5/0.7 25 11 J 1.1 23:40 Echelle 50(-166) 190 63 0.3/0.0 20 10 ND 1 1.5 #First temp is air, second temp is telescope. WEATHER DECEMBER 16 1999 Wind Time Temp F Dewp F MPH Direction Dust Sky Precip. 16:01 33 15 16 6 (N) 39 cirrus none 17:01 32 14 7 32 (NNE) 38 cirrus none 18:01 35 14 21 24 (NNE) 87 cirrus none 19:01 34 12 23 358 (N) 157 cirrus none 20:01 33 12 16 351 (N) 122 hvy cirrus none 21:01 33 14 18 25 (NNE) 240 cirrus none 22:01 32 13 10 29 (NNE) 127 cirrus none 23:01 32 13 14 36 (NE) 414 cirrus none 00:01 32 13 14 48 (NE) 385 cirrus none 01:01 36 13 13 346 (NNW) 194 mstly clr none 02:01 34 13 13 345 (NNW) 94 mstly clr none 03:01 34 13 3 358 (N) 132 mstly clr none 04:01 36 13 13 316 (NW) 184 mstly clr none 05:01 36 11 16 8 (N) 114 mstly clr none note: the wind was coming from the azimuth listed. The convention used is north=0 degrees, east=90 degrees. The dust count is particles > 1 micron per 0.1 cu. ft. TELESCOPE STATUS Primary, secondary, and tertiary mirrors in place and collimated. Primary support system operational. Mirror ventilation system in place. Telescope drives operational. Current Remark version: 2.55b5. Current guide software version: GIm Ctrlv3.0b27. - Karen Loomis, Russet McMillan