Date: Tue, 9 Sep 1997 17:17:53 -0600 (MDT) From: Karen Gloria Subject: 3.5-m obslog 970908 MONDAY SEPTEMBER 8, 1997 APACHE POINT OBSERVATORY OBSERVING LOG ACTUAL ASTRONOMER INSTRUMENT DATE START FINISH Staff none 9/8-9 - - INST SCHEDULED OBS WEATH EQUIP DAY NOTUSED I/RS/DN START FINISH D B D B D B USE D B EN00/S 20:42 05:19 - - - - - - - - - (note: times listed include instrument change time) ACTIVITY LOG (* means a trouble report has been issued or appended to) The engineering shutdown is in progress... From the day log (M. Klaene) - ... continued loadcell cals/adj installed independent mirror position inspection holes cont'd work in mirror cell (eyelid covers) ... FOCUS LOG SEPTEMBER 8 1997 Best Telescope Wind Seeing Time Inst Focus Az El #Temp Dir MPH filter FWHM " - no focus data - #The first temp is air, the second is truss, both in degrees Celsius WEATHER SEPTEMBER 8 1997 Wind Time Temp F Dewp. F MPH. Dir. Dust Sky Precip. 16:01 67 41 3 94 (E) 17:01 65 40 7 84 (E) 18:01 64 40 8 80 (E) 19:01 63 40 12 79 (ENE) 20:01 61 41 15 74 (ENE) 21:01 60 41 15 74 (ENE) 22:01 58 43 16 77 (ENE) 23:01 58 44 14 78 (ENE) 00:01 58 43 9 28 (NNE) 01:01 58 44 9 79 (ENE) 02:01 58 42 7 80 (E) 03:01 58 42 5 60 (ENE) 04:01 57 42 5 2 (N) 05:01 59 41 5 38 (NE) 06:01 59 42 2 83 (E) note: the wind was coming from the azimuth listed. The convention used is north=0 degrees, east=90 degrees. The dust count is particles > 1 micron per 0.1 cu. ft. TELESCOPE STATUS Primary, secondary, and tertiary mirrors in place and collimated. Primary support system operational. Mirror ventilation system in place. Telescope drives operational. Current Remark version: 2.36. Current guide software version: GIm Ctrlv3.0b11. -Karen