Date: Sun, 2 Nov 1997 05:49:05 -0700 (MST) From: Charles Corson Subject: 3.5m obslog 971101 SATURDAY NOVEMBER 1, 1997 APACHE POINT OBSERVATORY OBSERVING LOG ACTUAL ASTRONOMER INSTRUMENT DATE START FINISH Corson DIS 11/01 18:00 19:16 Richards DIS 11/01 19:16 05:00 INST SCHEDULED OBS WEATH EQUIP DAY NOTUSED I/RS/DN START FINISH D B D B D B USE D B PU01/S 18:36 19:16 0.7 0 0 0 0 0 0 0 0 UC01/S 19:16 04:58 9.7 0 0 0 0 0 0 0 0 (note: times listed include instrument change time) ACTIVITY LOG (* means a trouble report has been issued or appended to) Weather conditons were similiar to the past week with clear skies and windy conditions. The seeing was poor. The lens monitering program was very productive with two lens observed. Of note, scr5 on Apache is full. Gordon Richards and Maki Sekiguchi continued their program of QSO candidates. The first half of the night was slow due to difficulties with the afternoon arc lamp exposures. The seeing was also poor, and at times, terrible. However, the night was productive, no lost time. FOCUS LOG NOVEMBER 1 1997 Best Telescope Wind Seeing Time Inst Focus Az El #Temp Dir MPH filter FWHM " 18:06 DIS -50(6488) 271 67 8.4/9.6 0 21 r 1.5 19:20 DIS -25(6546) 152 48 7.9/8.3 333 4 r 1.8 #The first temp is air, the second is truss, both in degrees Celsius WEATHER NOVEMBER 1 1997 Wind Time Temp F Dewp. F MPH. Dir. Dust Sky Precip. 16:01 49 13 7 41 (NE) 263 clear none 17:01 47 13 19 334 (NNW) 275 clear none 18:01 47 12 10 23 (NNE) 251 clear none 19:01 47 8 13 359 (N) 270 clear none 20:01 46 6 17 328 (NNW) 274 clear none 21:01 44 3 13 10 (N) 304 clear none 22:01 44 7 9 55 (NE) 234 clear none 23:01 43 5 24 4 (N) 228 clear none 00:01 42 2 21 359 (N) 248 clear none 01:01 42 5 16 14 (NNE) 205 clear none 02:01 42 0 20 23 (NNE) 185 clear none 03:01 41 -1 15 13 (NNE) 227 clear none 04:01 39 -1 14 16 (NNE) 349 clear none 05:01 40 -1 10 22 (NNE) 248 clear none note: the wind was coming from the azimuth listed. The convention used is north=0 degrees, east=90 degrees. The dust count is particles > 1 micron per 0.1 cu. ft. TELESCOPE STATUS Primary, secondary, and tertiary mirrors in place and collimated. Primary support system operational. Mirror ventilation system in place. Telescope drives operational. Current Remark version: 2.36. Current guide software version: GIm Ctrlv3.0b11. Charles