Subject: Re: [sloan-25mlog 6260] 2.5m obslog 20220915 (SJD 59838) From: John Date: Fri, 16 Sep 2022 14:04:32 -0600 > On Sep 16, 2022, at 1:22 PM, Audrey Oravetz = wrote: >=20 >=20 >>> -- auto-fill 180lb dewar still doesn't work, We filled in manually. >>> -- interlock for protect the telescope from moving with a connected >>> nitrogen line to 180lb dewar NOT WORK. So that is dangerous: there = is >>> possibility to move telescope with connecting to 180lb dewar. >>=20 >> Interlock tested this morning and found to be fully functional. >>=20 >> I do not see where the interlock event happened in the observing log = from >> last night (that does not mean it didn=C3=A2=C2=80=C2=99t happen, it = means I would like a >> time stamp to more easily find it among all the other information >> recorded). If this note is referring to the incident recorded in the >> night log for September 09, that problem has been addressed already. >=20 > Thank you for this reminder John. Timestamps are a helpful tool when > diagnosing issues when they arise. >=20 > To investigate how the Sept 9th incident was possible, we attempted to > make the axes live with the line connected inside of the enclosure. = The > system rightfully did not allow it. Then, we opened the enclosure last > night and attempted to do the same thing with the line connected, and = the > axes became live. Estimated time was probably between 01:30-01:55Z. I see, I hadn=E2=80=99t realized it was a pre-observing test so I was = looking for a note of the incident in the log of nighttime observing. >=20 > I can test it again tonight and provide any additional information = that > you may need. >=20 > Audrey >=20 Hmm=E2=80=A6. I don=E2=80=99t quite know what to make of all this. In = this case, the PLC should behave no differently when the building is off = or on. If you don=E2=80=99t mind testing again tonight, could you do so and if = the axes all go live again, then use a jumper to go from the brass LN2 = connector over to the stainless cryo hose past the swivel connector. = I=E2=80=99ll leave a jumper wire for you in the top wide drawer of the = red tool box. >=20 >=20 >=20 >>=20 >> So to be clear, the message here is =C3=A2=C2=80=C2=9Cmore = information please=C3=A2=C2=80=C2=9D. This >> morning I checked the state of the interlock by bringing all three = axes >> into a live state and then connected the 180L dewar. The ALT and ROT = axes >> went OCL as they should have done. AZ stayed live because there is = no AZ >> interlock related to the cryo connection. >>=20 >> At this point, it looks as if there is no problem to me. Having more >> information about when the problem was seen will help me determine if = it >> is an intermittent one or if we really have solved it. >>=20 >> Autofill is a related issue but harder to test easily. >>=20 >=20 >=20