Subject: Re: [sloan-25mlog 4600] Re: 2.5m obslog 20190829 (SJD 58725) From: John Downey Date: Fri, 30 Aug 2019 09:56:53 -0600 > On Aug 30, 2019, at 9:05 AM, John Downey wrote: >=20 >>=20 >> ---- Observing Summary ---- >>=20 >> We discovered a bug within the new tcc code that slewed the telescope = in azimuth >> instead of the commanded altitude. The system may have been was = running stale >> commands issued earlier in the day. We will need to learn how to see = if there >> are commands in the queue, if there are delays issued, and how to = cancel them.=20 >>=20 >> John came to the site to help with an impossible-to-kill process that = was >> preventing the MCP from moving the telescope. >>=20 >> We were unable to relax the mirrors because we lost connection with = the galils >> and mirror controllers, and do not know how to re-establish the = connection.=20 >=20 > I think the problem is that the mirrors needed to be homed first. The = galil screen on the tpm shows them unhomed. Starting the test tcc shows = mirror controllers connected and telneting to one (M1) I can move the = mirror - we're replacing batteries and I like to set the migs to zero = while the mirror is in the home position. >=20 > I think once we do that and I home all the actuators it will relax ok. Homed and relaxed M1. Deferring M2 so that we can do tcc slew tests = with the enclosure off. >=20 > When we go to 5 to open for tcc test slews I'll reset the M2 mig that = is hanging things up and home M2 also. >=20 >>=20 >> We successfully connected with the engineering camera, but was unable = to take >> images because of a connection problem with the gcameraICC.=20 >=20 > Not sure yet what the trouble is with the engineering camera. The = gcam had a broken power connection this morning. > ____________________________________________________________ > Logs of Nightly APO Activities > = https://trac.sdss.org/tracmailman/browser/private/sloan-25mlog/index.html