Subject: Re: [sloan-25mlog 3802] 2.5m obslog 20171216 (SJD 58104) From: John Downey Date: Sun, 17 Dec 2017 07:47:41 -0700 Thanks Kaike, that's perfect. John > On Dec 17, 2017, at 7:46 AM, Kaike Pan wrote: >=20 > I attached on a =E2=80=9CBAD Pressure=E2=80=9D note on the dewar. = -kaike >=20 >> On Dec 17, 2017, at 7:20 AM, John Downey = wrote: >>=20 >>=20 >>> Notes >>> =3D =3D =3D >>>=20 >>> - SP1 LN2 dewar had the pressure of 8 psi. We had to replace >>> the SP1 180L dewar to be able to do a normal fill. Check back, we >>> found that the pressure reading was at 7 PSI right after the dewar=20= >>> was replaced, It would be nice if the pressure is checked when a =20= >>> dewar is replaced.=20 >>>=20 >>=20 >> I've sent email around to the day staff about this, explaining that = it is important to check the pressure because low pressure on the 10l = can cause a fill fault and camera warm up if not addressed after the = pressure alert is sent. In fairness I sometimes forget to check too, = when I change the dewars. >>=20 >> When this kind of thing happens, if you could note the dewar number = that would make it easier to change the pop off. Usually it's pretty = easy to find the offending dewar the next day, but noting the number for = us makes sure it gets done. >>=20 >> Thanks, >> John >> ____________________________________________________________ >> Logs of Nightly APO Activities >> = https://trac.sdss.org/tracmailman/browser/private/sloan-25mlog/index.html >=20