Date: Thu, 20 Dec 2012 23:19:45 -0000 (UTC) Subject: Re: [sdss3-25mlog 984] Re: 2.5m obslog 20121219 (MJD 56281) From: dmbiz@apo.nmsu.edu Hi Dan, in my understanding the building moved a bit slower than usual, almost certainly because of -9C temperature when we opened. No any stops or unusual behavior noticed. Dmitry > Hi Kaike, > > Yes, I think all that can be attributed to the 1 PPS problem. What I > was asking about was the short line saying "the building had a hard > time moving". Do you know any more on that (see questions below in > original message)? > > -Dan > > On Dec 20, 2012, at 7:41 AM, Kaike Pan wrote: > >> Hi, Dan, >> >> I don't have information on the very first failure. Here are what I >> saw after I arrived the site: >> >> For some reason, tcc dead (before I arrived there), so we did telstop >> and telrun from tcc, >> hub startNubs tcc25m from STUI, moved the telescope from MCP but could >> not from tcc. >> Then we rebooted mcp, and still could not move the telescope from tcc >> (we noticed that rotator >> was not there, and could not move the rotator from neither mcp nor d >> tcc, so did tcc set inst=spectro, >> this allowed us to move the rotator from mcp, still not from tcc). We >> tried more then five >> times: axis init and tcc track, each time we saw a slew progress bar >> appeared >> in STUI, and disappeared in less than one sec. Apparently, tcc attempted >> to start the requested >> slew, but never be able to start the slew. >> >> -kaike >> >> >> On Dec 20, 2012, at 7:12 AM, Dan Long wrote: >> >>> We know about the problems with the 1 PPS, but would like more >>> information on the enclosure motion issue. Can you describe it in >>> more detail? Was it having difficulty starting to move? Was it >>> stopping once it started? Where was it having trouble? How many >>> times did it have trouble? >>> >>> Thanks, >>> >>> -Dan >>> >>> On Dec 20, 2012, at 3:09 AM, marchante@apo.nmsu.edu wrote: >>> >>>> >>>> APACHE POINT OBSERVATORY SDSS 2.5M >>>> >>>> OBSERVING LOG >>>> Wednesday December 19, 2012 >>>> >>>> (MJD 56281) >>>> >>>> ---- Observing Team ---- >>>> >>>> Dmitry Bizyaev >>>> Moses Marchante >>>> >>>> Kaike Pan (afternoon) >>>> >>>> MaNGA team: >>>> >>>> >>>> ---- Observing Plan ---- >>>> >>>> All Boss >>>> 19 Dec 2012 56281.0 0.50 01:14 12:48 00:07 11:43 BOSS 11.6 hours >>>> >>>> ---- Observing Summary ---- >>>> >>>> Boss: >>>> Cart: Plate >>>> 18 6129 not Done >>>> on Cart 18 plate 6129 yellow WSIGMA 1.26 on ARC-00153055 >>>> 02:54:54 encl25m : closed; High wind, bad seeing >>>> >>>> Building had hard time moving on slow speed, only a little better on >>>> high, >>>> >>>> >>>> TCC unable to control Telescope, still able to use MCP for emergency >>>> moves, >>>> called in Joe H. Powered on/off amps. rebooted MCP, still no control >>>> with TCC. >>>> Had to call Jon B. to check computer logs. >>> >>> _____________________________________________________ >>> Message 982 of sdss3-25mlog - Logs of nightly APO activities. >>> https://trac.sdss3.org/tracmailman/browser/private/sdss3-25mlog/all/982.html >>> sdss3-25mlog@sdss3.org >>> https://sdss3.org/mailman/listinfo/sdss3-25mlog >> > > _____________________________________________________ > Message 984 of sdss3-25mlog - Logs of nightly APO activities. > https://trac.sdss3.org/tracmailman/browser/private/sdss3-25mlog/all/984.html > sdss3-25mlog@sdss3.org > https://sdss3.org/mailman/listinfo/sdss3-25mlog >