From: Elena Malanushenko Subject: Re: 2.5m obslog 20100905 (MJD 55445) Date: Mon, 6 Sep 2010 16:30:28 -0600 --Apple-Mail-146-562351210 Content-Transfer-Encoding: quoted-printable Content-Type: text/plain; charset=UTF-8; delsp=yes; format=flowed > "Override Complete" -- regardless of what platedb thinks, consider =20 > this "Complete" =46rom my mac Dictionary: override verb |=CB=8C=C5=8Dv=C9=99r=CB=88r=C4=ABd| ( past -rode; past part. = -ridden) [ trans. ] 1 use one's authority to reject or cancel (a decision, view, etc.) : =20 the legislature's insistence on overriding his budget vetoes. =E2=80=A2 interrupt the action of (an automatic device), typically in = order =20 to take manual control : you can override the cutout by releasing the =20= switch. =E2=80=A2 be more important than : this commitment should override all = other =20 considerations. 2 technical extend over; overlap : the external rendering should not =20 override the vapor barrier. 3 travel or move over (a place or thing) : part of the deposit was =20 overridden and covered by the advancing ice. Elena Malanushenko elenam@apo.nmsu.edu On 9/6/10, at 8:13 , David Schlegel wrote: > Elena and Dmitry, > > Is this just a matter of not everyone agreeing on what's meant > by the "Completion Status" field? I'll not that I don't see it > described on the platedb or in the observing instructions. > > My understanding of these 5 values are: > "Complete" -- observed and automatically declared done by platedb =20 > based upon S/N > "Incomplete" -- observed and not done by above criteria > "Override Complete" -- regardless of what platedb thinks, consider =20 > this "Complete" > "Override Incomplete" -- regardless of what platedb thinks, =20 > consider this "Incomplete" > "Do Not Observe" -- do not observe for some other reason, such as =20 > it's a test plate > > For the BOSS plates observed to completion this month, all of them =20 > (except 4182, > which is only half-done) have comments that say things like "this =20 > plate is done", > but they have all of the different "Completion Status" values -- =20 > some are > "Override Complete", or "Orverride Incomplete", or "Do Not Observe". > I think they're all supposed to be "Override Complete" (except 4182). > > Could someone with permissions on platedb make these changes? > > -David > > > On Sep 6, 2010, at 5:00 AM, Elena M wrote: > >> We checked our plates and found out that four of them >> were done before. We checked plates which we marked as >> done last night and found them availble for the next night >> selection. We still had 3 new plates for that night >> and one with partial signal. We try to observe new plates. >> The ticket was submitted. As a temporary solution we >> printed the list of availble plates and marked >> observed plates as done there. The list is in control room. > > > > DSS DSS DSS DSS DSS Digital Sky Survey DSS DSS DSS DSS DSS DSS > DSS *** The information posted to SDSS mailing lists is proprietary =20= > *** > DSS This is message 5360 in the sdss-25mlog archive, URL > DSS http://www.astro.princeton.edu:81/sdss-25mlog/msg.=20 > 5360.html > DSS The index is at http://www.astro.princeton.edu:81/sdss-25mlog/=20 > INDEX.html > DSS To join/leave the list, go to > DSS http://www.astro.princeton.edu:81/cgi-bin/=20 > mailinglists.pl/show_subscription?list=3Dsdss-25mlog > DSS To post a message, mail it to sdss-25mlog@astro.princeton.edu > DSS > DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS DSS --Apple-Mail-146-562351210 Content-Transfer-Encoding: quoted-printable Content-Type: text/html; charset=UTF-8 "Override Complete" -- = regardless of what platedb thinks, consider this = "Complete"=46r= om my mac Dictionary:override verb = |=CB=8C=C5=8Dv=C9=99r=CB=88r=C4=ABd| ( past -rode; past part. -ridden) [ = trans. ] 1 use one's authority to reject or cancel (a = decision, view, etc.) : the legislature's insistence on overriding his = budget vetoes. =E2=80=A2 interrupt the action of (an = automatic device), typically in order to take manual control : you can = override the cutout by releasing the switch. =E2=80=A2 be = more important than : this commitment should override all other = considerations. 2 technical extend over; overlap : the = external rendering should not override the vapor barrier. 3 = travel or move over (a place or thing) : part of the deposit was = overridden and covered by the advancing = ice. Elena = Malanushenkoelenam@apo.nmsu.edu On 9/6/10, at = 8:13 , David Schlegel wrote:Elena = and Dmitry,Is this just a matter of not = everyone agreeing on what's meantby the "Completion Status" = field? I'll not that I don't see itdescribed on the = platedb or in the observing instructions.My = understanding of these 5 values are:"Complete" -- observed = and automatically declared done by platedb based upon = S/N"Incomplete" -- observed and not done by above = criteria"Override Complete" -- regardless of what platedb = thinks, consider this "Complete""Override Incomplete" -- = regardless of what platedb thinks, consider this = "Incomplete""Do Not Observe" -- do not observe for some other = reason, such as it's a test plateFor the BOSS = plates observed to completion this month, all of them (except = 4182,which is only half-done) have comments that say things = like "this plate is done",but they have all of the different = "Completion Status" values -- some are"Override Complete", or = "Orverride Incomplete", or "Do Not Observe".I think they're = all supposed to be "Override Complete" (except = 4182).Could someone with permissions on = platedb make these = changes?-DavidOn Sep 6, 2010, at 5:00 AM, Elena M wrote: = We checked our plates and found out that = four of them were done before. We checked plates which = we marked as done last night and found them availble for = the next night selection. We still had 3 new plates for = that night and one with partial signal. We try to = observe new plates. The ticket was submitted. As a = temporary solution we printed the list of availble = plates and marked observed plates as done there. The = list is in control room. = DSS DSS = DSS DSS DSS Digital Sky Survey DSS DSS DSS DSS DSS = DSSDSS *** The information posted to SDSS mailing lists is = proprietary ***DSS This is message 5360 in the = sdss-25mlog archive, URLDSS http:= //www.astro.princeton.edu:81/sdss-25mlog/msg.5360.htmlDSS&n= bsp; The index is at http://w= ww.astro.princeton.edu:81/sdss-25mlog/INDEX.htmlDSS = To join/leave the list, go toDSS = http://www.astro.princeton.edu:81/cgi-bin/ma= ilinglists.pl/show_subscription?list=3Dsdss-25mlogDSS = To post a message, mail it to sdss-25mlog@astro.princeto= n.eduDSSDSS DSS DSS DSS DSS DSS DSS DSS DSS = DSS DSS DSS DSS DSS DSS DSS = --Apple-Mail-146-562351210--