Date: Tue, 23 Jun 1998 05:55:32 -0600 From: long@apo.nmsu.edu (Dan Long) Subject: 2.5m night report 980622 MONDAY JUNE 22, 1998 APACHE POINT OBSERVATORY SDSS 2.5m OBSERVING LOG The enclosure was opened at 20:00. The weather was clear and remained so all night. Collimation work continued until about 21:30. The telescope was moved into position for scanning along the equator at the meridian. A couple problems were encountered in doing this. The first problem was that the windscreen would not follow the telescope in azimuth for any but the slowest speeds. The number 1 motor would start spinning and the others would remain still and the windscreen would not move. Some sleuthing by Pat Waddell turned up that the way the motors act when in the servo mode ends up with only the first motor being driven with more current as the demand increases. When run in manual mode, all three motors appear to share the load equally. This is how we moved the telescope in azimuth. The second problem was that the telescope was found to be quite out of balance ( ~50 lb ) front to back in altitude when near the zenith. This was traced to a lack of counterweight cover on the on one of the front counterweights. Once in place the telescope moved smoothly even holding its position in altitude to within a few arcseconds without the brake. The telescope was in place and ready to run by about 22:30. Much of the night was spent getting the mirrors properly aligned to achieve the best images. See Brian Yanny's log for details of positions. The last portion of the night was spent taking some frames for working with focus via astrometric chips. Another thing I noticed tonight was that the sound proofing insulation around the MG set sticks out far enough to catch on the pier when moving in azimuth. It scrapes hard enough that the screw holding it on have chipped the paint on the corners of the pier in spots. The telescope was closed around 05:00. Dan